logo
ProjectClosed

Southwest link Transmission

Closed · Colorado · Last reported Mar 2024

Source: Dodge USA

Work to be performed generally includes: Installation of approximately 6657 linear feet of 30-inch diameter ductile iron potable water pipe, 469 linear feet of 42-inch diameter steel casing under I-25 and the BNSF railroad installed with trenchless methods, 486 linear feet of 30-inch diameter fusible PVC carrier pipe, a 30-inch steel pipe connection to the Owner s existing 3 MG steel tank, a conne

Status
Closed
Sector
Metal, Water Supply and Storage, Rail, Steel, Government, Commercial, Waste Processing and Treatment
Location
Fountain, Colorado, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Southwest link Transmission

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Southwest link Transmission” is an infrastructure initiative in the Metal sector, located in Fountain, Colorado, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work to be performed generally includes: Installation of approximately 6657 linear feet of 30-inch diameter ductile iron potable water pipe, 469 linear feet of 42-inch diameter steel casing under I-25 and the BNSF railroad installed with trenchless methods, 486 linear feet of 30-inch diameter fusible PVC carrier pipe, a 30-inch steel pipe connection to the Owner s existing 3 MG steel tank, a connection to the Owner s existing 36-inch diameter HDPE watermain, and all ancillary work to complete...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Colorado

City

Fountain

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Water Supply and Storage, Rail, Steel, Government, Commercial, Waste Processing and Treatment

Article published date

2024-03-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project