Southwest Water Reclamation Facility

Sector: Car parking • Location: World

Source: Water Technology

Project
Closed

The new Southwest Water Reclamation Facility treats wastewater from about 30,000 homes and is invisible to neighbours because of a buffering berm. Image courtesy of Spitwater. Reclaimed water produced by the SWRF in Henderson is used to irrigate golf courses, city landscapes and Boulder Highway medians. Image courtesy of Thoursie. The Southwest Water Reclamation Facility (SWRF) is a satellite wast

Project Information FAQ

Project Information

5 Q
The project “Southwest Water Reclamation Facility” is an infrastructure initiative in the Car parking sector, located in World. Taiyo aggregates data on it from Water Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The new Southwest Water Reclamation Facility treats wastewater from about 30,000 homes and is invisible to neighbours because of a buffering berm. Image courtesy of Spitwater. Reclaimed water produced by the SWRF in Henderson is used to irrigate golf courses, city landscapes and Boulder Highway medians. Image courtesy of Thoursie. The Southwest Water Reclamation Facility (SWRF) is a satellite wastewater treatment plant located in the city of Henderson, Nevada, USA. Image courtesy of US Census. The City Henderson Nevada Southwest Water Reclamation Facility treats about 8mgd of wastewater for urban reuse and to fill ponds of a wildlife habitat bird viewing preserve. Image courtesy of Lip Kee Yap. Southwest Water Reclamation Facility (SWRF) is a newly opened satellite wastewater treatment plant in the city of Henderson, in Nevada, US. It was officially opened in September 2011. It is located near Las Vegas Beltway at St. Rose Parkway. The SWRF treats wastewater produced from south and west Henderson for reuse. It is designed with a capacity to treat eight million gallons a day (mgd) of watewater. The treated effluent is used for non-drinking and irrigation purposes. The cost of the project was about $94.4m. It is an addition to the already operational 18mgd water reclamation facility in the city of Henderson. Necessity for a satellite water reclamation facility in Henderson was identified in 1999. An Area-Wide Reuse Study for water reuse opportunities was conducted by the cities of Henderson, Las Vegas Valley Water District (LVVWD), North Las Vegas, Las Vegas and Clark County Water Reclamation District in July 2000. The study concluded the possibilities of the installation of new satellite reuse facilities southwest of Clark County near Henderson, northwest of Las Vegas and in North Las Vegas. The study plan was revised, updated and approved by the Southern Nevada Water Authority (SNWA) and Clean Water Coalition in September 2007. Construction of the Nevada Southwest Water Reclamation Facility began following this. Henderson is the only city in Nevada to reclaim all its generated wastewater. The demand for reclaimed water is increasing due to the rapidly growing community in the south and west areas of the city. Wastewater generated in the southwest Henderson town was earlier conveyed to Galleria and Pabco water reclamation facilities. The SWRF allows treatment and reuse of water within the city and eliminates the need to convey the wasterwater and saves potable water and energy costs. The reclaimed water was pumped back to irrigate nine golf courses. The treated water is used for dust control and irrigation of the city landscapes, Boulder Highway medians, construction, cooling the electric power plants and to fill ponds of a wildlife habitat bird viewing preserve. The excess water is transferred to the Lake Mead reservoir, in the Colorado River system. The SWRF is built over an area of 20 acres. The facility occupies only seven acres, with the rest being used for construction of the buffering berm. The 35ft high berms surround the plant to minimise the visual impact on the neighbourhood and reduce the environmental impact. These berms are landscaped with native desert plants and xeriscape to create a neighbourhood park. A neighbourhood advisory committee was involved in the design of the site surroundings. The satellite facility is designed to treat sewage water from about 30,000 homes. The SWRF is currently operating at a capacity of 4.5mgd before reaching the full capacity of 8mgd. Construction of the facility was started in April 2008. It was built in four phases. The phases involved construction of berm and entrance road, the facility, reclaimed pipeline, and control stations to calculate the rate of flow. The plant purifies and disinfects wastewater through screens, ultra-violet (UV) disinfection process and membrane bioreactors (MBR). MBR has a small footprint and requires less space for chemical storage and usage. The SWRF is deployed with Supervisory Control and Data Acquisition (SCADA) systems to monitor and control the treatment processes. The system alerts the operator upon a change in process parameters. The wastewater treatment plant is a fully enclosed facility. Some processes of the plant are also subterranean which reduce the noise and odour. The facility is equipped with granular activated carbon canisters and biofilters to absorb the odours. This technology eliminates the need for chemicals. The canisters will be replaced from time to time to increase the system performance. The odour is further reduced by pumping fresh air into the main intake building through large fans. The city of Henderson contracted CH2M Hill to provide engineering services for the plant construction. Construction manager for the plant was Carollo Engineers. EADOC web based management system (WBMS) software was used for resource management. Sletten Companies and Brahma Grou were the subcontractors. Advantage Consulting Engineers was contracted for locating the facility resource and other off-site pipeline designs.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data