Southwire Heflin Plant Expansion
Sector: Manufacturing (Industrial) • Location: Heflin, Alabama, United States
Source: The City Menus
Southwire is expanding its Heflin, Alabama operations by adding approximately 340,000 square feet to the existing plant. This expansion will enhance state-of-the-art medium voltage cable production, create more than 85 new jobs, and include sustainability features such as a rainwater collection tank. Construction is expected to begin in late 2025 with equipment and capacity coming online in late 2
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Warehouse
- Location
- Heflin, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- The City Menus
ConstructChat
Ask ConstructChat about Southwire Heflin Plant Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Southwire is expanding its Heflin, Alabama operations by adding approximately 340,000 square feet to the existing plant. This expansion will enhance state-of-the-art medium voltage cable production, create more than 85 new jobs, and include sustainability features such as a rainwater collection tank. Construction is expected to begin in late 2025 with equipment and capacity coming online in late 2027. |
Original sector | Manufacturing |
Location
Country | United States of America (USA) |
State | Alabama |
City | Heflin |
Source
Source | The City Menus |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Warehouse |
Article published date | 2025-11-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
