Soyanggang multi-purpose dam
One of 4,610 projects Taiyo tracks in South Korea.
Source: Hyundai Engineering
Soyang River Multipurpose Dam, one of top two public works along with Gyeongbu Expressway in the 1960s, brought a game changer in South Korea's dam construction in terms of not only size but also technological competence.It was originally designed as a C.G.D., but Hyundai E&C proposed a rock-fill dam method by using sand and gravels easily accessible. We expected the transportation of materials wo
- Status
- Closed
- Sector
- Hydro, Power Generation (CCGT), Tunnel, Road, Water Supply and Storage
- Location
- South Korea
- Updated
- 22 Jul 2026
- Source
- Hyundai Engineering
ConstructChat
Ask ConstructChat about Soyanggang multi-purpose dam
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Soyang River Multipurpose Dam, one of top two public works along with Gyeongbu Expressway in the 1960s, brought a game changer in South Korea's dam construction in terms of not only size but also technological competence.It was originally designed as a C.G.D., but Hyundai E&C proposed a rock-fill dam method by using sand and gravels easily accessible. We expected the transportation of materials would considerably cost us and extreme changes in materials due to the shortage of cement and rebar.The preparatory work, diversion conduit work, and coffer dam work were constructed before initiating the main dam construction. The key point in constructing the main dam was the compaction of banking materials since it was the first rock-fill dam in Korea. We performed a banking test on framing materials before banking. According to the test results, we determined a laying thickness to be economic and safe to each voltage equipment and adjusted moisture content. The framing work of the main dam was also built in the following order: foundation excavation work, foundation treatment work, and banking work. It was identical to that of the cofferdam work.Soyang River Multipurpose Dam was the largest construction performed by Hyundai E&C in 1967. It was all the more meaningful since at that time a rock-fill dam was economical only when it was constructed 30m or under.We left many good examples in the first alternative work particularly through the construction of Soyang River Dam. We gained many administrative experiences including workforce management, quality management, and efficient operation of equipment while proceeding a large-scale construction. We were also able to accumulate many technological knowhow through the experience gained from tunnel construction, selection of framing materials, density test, operation of new equipment, foundation work for power plant, facility construction of power generating station, and quality test. |
Original sector | Infrastructure |
Budget |
Location
Country | South Korea |
Source
Source reliability | High |
Source | Hyundai Engineering |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Tunnel, Road, Water Supply and Storage |
Article published date | 2023-05-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project