Sparks (NV) Walmart Fullfilment Center 9066-1000
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Remove Interior Walls, Equipment And Finishes At Entry Vestibule. Remove / Replace Exterior Storefront At Vestibule. Remove Portion Of Existing Steel Racks For A Secure Cage. Interior Remodel Of An Existing Walmart Distribution Center. Remodel Consist Of Removing And Adding Walls To Adjust For New Associate Entry Layout. Add Secure Cage To Warehouse Area. No Changes To Life Safety Or Occupant Load
- Status
- Prospective
- Sector
- Steel, Manufacturing (Industrial), Warehouse, Car parking, Commercial, Automotive, Metal
- Location
- Sparks, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sparks (NV) Walmart Fullfilment Center 9066-1000
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding-Invitation |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Remove Interior Walls, Equipment And Finishes At Entry Vestibule. Remove / Replace Exterior Storefront At Vestibule. Remove Portion Of Existing Steel Racks For A Secure Cage. Interior Remodel Of An Existing Walmart Distribution Center. Remodel Consist Of Removing And Adding Walls To Adjust For New Associate Entry Layout. Add Secure Cage To Warehouse Area. No Changes To Life Safety Or Occupant Load At Main Building. Access Controls For Associate Parking. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Sparks |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Manufacturing (Industrial), Warehouse, Car parking, Commercial, Automotive, Metal |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
