Sparrows Residential Mixed Use Phase 1
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Sparrows development is located on the north side of State Route 356 near Silverville Road and State Route 28 in the Town Center District. The proposed properties for development include Butler County Parcel Numbers 040-1F05-10-0000 and 040- 1F05-8-0000. Only parcel 040-1F05-10-0000 is proposed to be developed at this time and the remaining parcel will be designed and permitted under a separate pr
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Road, Consumer Products, Residential, Commercial
- Location
- Sarver, Pennsylvania, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sparrows Residential Mixed Use Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Sparrows development is located on the north side of State Route 356 near Silverville Road and State Route 28 in the Town Center District. The proposed properties for development include Butler County Parcel Numbers 040-1F05-10-0000 and 040- 1F05-8-0000. Only parcel 040-1F05-10-0000 is proposed to be developed at this time and the remaining parcel will be designed and permitted under a separate process in the future. The entire development has been designed in accordance with all Buffalo Town... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Sarver |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Consumer Products, Residential, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
