Sparta 2022 ARPA Sewer System Rehabilitation - Contract C
Sector: Waste Processing and Treatment • Location: Sparta, Tennessee, United States of America
Source: Dodge
2022 ARPA Sewer System Rehabilitation Contract C: Mayberry Street Lift Station- Grinder/ Screen/ Auger addition. Re-grading of the site to allow for a second entrance into the sewer lift station site. This includes earthwork and gravel paving and erosion control. Double gate installation into the existing fencing. Bypass pumping as needed to allow for modifications. Precast manhole modifications t
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road, Commercial, Cement, Government, Manufacturing (Industrial)
- Location
- Sparta, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sparta 2022 ARPA Sewer System Rehabilitation - Contract C
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 2022 ARPA Sewer System Rehabilitation Contract C: Mayberry Street Lift Station- Grinder/ Screen/ Auger addition. Re-grading of the site to allow for a second entrance into the sewer lift station site. This includes earthwork and gravel paving and erosion control. Double gate installation into the existing fencing. Bypass pumping as needed to allow for modifications. Precast manhole modifications to include bottom and top modifications, Bottom modifications as needed to remove concrete and rem... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Sparta |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road, Commercial, Cement, Government, Manufacturing (Industrial) |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
