SPCEVE 560 Boylston ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Erect a hydraulic performing stage model Stageline SL250 new generation on August 1st 2013 for Radio 92.9 Concert. Stage will be ready for inspection at noon the same date. Stage dimensions are 32' X 24' with a 5' floor and a 20' roof. Performance time will be held from 6:00 P.M. to 8:00 P.M.
- Status
- Prospective
- Sector
- Stadium, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about SPCEVE 560 Boylston ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Erect a hydraulic performing stage model Stageline SL250 new generation on August 1st 2013 for Radio 92.9 Concert. Stage will be ready for inspection at noon the same date. Stage dimensions are 32' X 24' with a 5' floor and a 20' roof. Performance time will be held from 6:00 P.M. to 8:00 P.M. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Stadium, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
