logo

SPCG Bureerum 1 & 2 & 3 Solar Plants

Sector: Solar • Location: Thailand

Source: World Bank Group

Project
Active

SPCG was developing the Bureerum 1 (7.46MW), Bureerum 2 (7.46MW) and Bureerum 3 (7.46MW) solar power plants. The developer holds PPAs with the Provincial Electricity Authority (PEA) for 34 projects, with a separate subsidiary developing each project. The project Korat 1 was also part of this group of projects. the Bureerum projects are numbers 18, 19 and 20 out of 34.

Bureerum 1 was located at: H

Status
Prospective
Sector
Solar, Steel, Power Generation (CCGT), Government, Commercial
Location
Thailand
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about SPCG Bureerum 1 & 2 & 3 Solar Plants

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SPCG Bureerum 1 & 2 & 3 Solar Plants” is an infrastructure initiative in the Solar sector, located in Thailand. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

SPCG was developing the Bureerum 1 (7.46MW), Bureerum 2 (7.46MW) and Bureerum 3 (7.46MW) solar power plants. The developer holds PPAs with the Provincial Electricity Authority (PEA) for 34 projects, with a separate subsidiary developing each project. The project Korat 1 was also part of this group of projects. the Bureerum projects are numbers 18, 19 and 20 out of 34. Bureerum 1 was located at: Hinclone Sub District, Jakaraj District, Nakhon Ratchasima Province. The project company was named: Solar Power (Bureerum 1) Company Limited (BR1) Bureerum 2 was located at: Toung-Katent Sub District, Nongkii District, Bureerum Province. The project company was named: Solar Power (Bureerum 2) Company Limited (BR2) Bureerum 3 was located at: Bansai Sub District, Prakhonchai District, Bureerum Province. The project company was named: Solar Power (Bureerum 3) Company Limited (BR3) Commissioning for all three plants was expected in January 2013, construction started in August 2012. The panels were supplied by Kyocera Corporation, Japan (all 3 plants). The inverters were supplied by SMA Solar Technology in Germany.The projects by SPCG held a PPA with the Provincial Electricity Authority (PEA), for 5 years - open ended. The PPA provided for a feed-in adder of THB 8.0 on top of the base tariff for 10 years after commissioning. The projects receive tax benefits of 0% for the first 8 years, and half of normal tax rate for the 5 year following. Total project cost for each plant was reported at 157,500,000 Baht(US$5.3 million), or a total of US$ 15.9 million. Financial closure date was unavailable, hence the project was reported as under development here. Financial closure would be estimated at January 2013 based on the commissioning date, which requires an update for 2013 collection cycle. http://www.researchviews.com/energy/clean-technology/clean-technology/NewsReport.aspx?sector=clean%20technology&ArticleID=546301 http://www.spcg.co.th/solarpower/br1/en/index.php http://www.spcg.co.th/solarpower/br2/en/index.php http://www.spcg.co.th/solarpower/br3/en/index.php

Original sector

Energy

Budget

Location

Country

Thailand

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Steel, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project