logo

SPCG Bureerum 1 & 2 & 3 Solar Plants

Sector: Solar • Location: Thailand

Source: World Bank Group

Project
Active

SPCG was developing the Bureerum 1 (7.46MW), Bureerum 2 (7.46MW) and Bureerum 3 (7.46MW) solar power plants. The developer holds PPAs with the Provincial Electricity Authority (PEA) for 34 projects, with a separate subsidiary developing each project. The project Korat 1 was also part of this group of projects. the Bureerum projects are numbers 18, 19 and 20 out of 34.

Bureerum 1 was located at: H

Project Information FAQ

Project Information

5 Q
The project “SPCG Bureerum 1 & 2 & 3 Solar Plants” is an infrastructure initiative in the Solar sector, located in Thailand. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

SPCG was developing the Bureerum 1 (7.46MW), Bureerum 2 (7.46MW) and Bureerum 3 (7.46MW) solar power plants. The developer holds PPAs with the Provincial Electricity Authority (PEA) for 34 projects, with a separate subsidiary developing each project. The project Korat 1 was also part of this group of projects. the Bureerum projects are numbers 18, 19 and 20 out of 34. Bureerum 1 was located at: Hinclone Sub District, Jakaraj District, Nakhon Ratchasima Province. The project company was named: Solar Power (Bureerum 1) Company Limited (BR1) Bureerum 2 was located at: Toung-Katent Sub District, Nongkii District, Bureerum Province. The project company was named: Solar Power (Bureerum 2) Company Limited (BR2) Bureerum 3 was located at: Bansai Sub District, Prakhonchai District, Bureerum Province. The project company was named: Solar Power (Bureerum 3) Company Limited (BR3) Commissioning for all three plants was expected in January 2013, construction started in August 2012. The panels were supplied by Kyocera Corporation, Japan (all 3 plants). The inverters were supplied by SMA Solar Technology in Germany.The projects by SPCG held a PPA with the Provincial Electricity Authority (PEA), for 5 years - open ended. The PPA provided for a feed-in adder of THB 8.0 on top of the base tariff for 10 years after commissioning. The projects receive tax benefits of 0% for the first 8 years, and half of normal tax rate for the 5 year following. Total project cost for each plant was reported at 157,500,000 Baht(US$5.3 million), or a total of US$ 15.9 million. Financial closure date was unavailable, hence the project was reported as under development here. Financial closure would be estimated at January 2013 based on the commissioning date, which requires an update for 2013 collection cycle. http://www.researchviews.com/energy/clean-technology/clean-technology/NewsReport.aspx?sector=clean%20technology&ArticleID=546301 http://www.spcg.co.th/solarpower/br1/en/index.php http://www.spcg.co.th/solarpower/br2/en/index.php http://www.spcg.co.th/solarpower/br3/en/index.php

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data