SPCG Bureerum 1 & 2 & 3 Solar Plants
Active · Thailand
Source: World Bank Group
SPCG was developing the Bureerum 1 (7.46MW), Bureerum 2 (7.46MW) and Bureerum 3 (7.46MW) solar power plants. The developer holds PPAs with the Provincial Electricity Authority (PEA) for 34 projects, with a separate subsidiary developing each project. The project Korat 1 was also part of this group of projects. the Bureerum projects are numbers 18, 19 and 20 out of 34.
Bureerum 1 was located at: H
- Status
- Prospective
- Sector
- Steel, Solar, Power Generation (CCGT), Government, Commercial
- Location
- Thailand
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SPCG Bureerum 1 & 2 & 3 Solar Plants
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SPCG was developing the Bureerum 1 (7.46MW), Bureerum 2 (7.46MW) and Bureerum 3 (7.46MW) solar power plants. The developer holds PPAs with the Provincial Electricity Authority (PEA) for 34 projects, with a separate subsidiary developing each project. The project Korat 1 was also part of this group of projects. the Bureerum projects are numbers 18, 19 and 20 out of 34. Bureerum 1 was located at: Hinclone Sub District, Jakaraj District, Nakhon Ratchasima Province. The project company was named: Solar Power (Bureerum 1) Company Limited (BR1) Bureerum 2 was located at: Toung-Katent Sub District, Nongkii District, Bureerum Province. The project company was named: Solar Power (Bureerum 2) Company Limited (BR2) Bureerum 3 was located at: Bansai Sub District, Prakhonchai District, Bureerum Province. The project company was named: Solar Power (Bureerum 3) Company Limited (BR3) Commissioning for all three plants was expected in January 2013, construction started in August 2012. The panels were supplied by Kyocera Corporation, Japan (all 3 plants). The inverters were supplied by SMA Solar Technology in Germany.The projects by SPCG held a PPA with the Provincial Electricity Authority (PEA), for 5 years - open ended. The PPA provided for a feed-in adder of THB 8.0 on top of the base tariff for 10 years after commissioning. The projects receive tax benefits of 0% for the first 8 years, and half of normal tax rate for the 5 year following. Total project cost for each plant was reported at 157,500,000 Baht(US$5.3 million), or a total of US$ 15.9 million. Financial closure date was unavailable, hence the project was reported as under development here. Financial closure would be estimated at January 2013 based on the commissioning date, which requires an update for 2013 collection cycle. http://www.researchviews.com/energy/clean-technology/clean-technology/NewsReport.aspx?sector=clean%20technology&ArticleID=546301 http://www.spcg.co.th/solarpower/br1/en/index.php http://www.spcg.co.th/solarpower/br2/en/index.php http://www.spcg.co.th/solarpower/br3/en/index.php |
Original sector | Energy |
Budget |
Location
Country | Thailand |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Steel, Solar, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in Thailand
- SPCG Khon Kaen 1 Solar Plant
- Korat5 Solar Power Plant
- Euclid Creek Storage Tunnel Project, Cleveland, Ohio
- Nile River Barrage, Naga Hammadi
- UZOS South-West Wastewater Treatment Plant
- Missouri River Wastewater Treatment Plant (WWTP), Omaha, Nebraska
- Millbrook Wastewater Treatment and Recycling Centre, United Kingdom
- Tannur Dam, Jordan, Middle East