SPCG Khon Kaen II Solar Plant
Sector: Commercial • Location: Thailand
Source: World Bank Group
SPCG was planning the development of the 7.46MW Khon Kaen 2 solar plant. The project company is Solar Power (Bureerum 1) Company Limited ("SPKK2")
Construction started in August 2012 and commercial operation was expected for January 31 2013. The projects by SPCG held a PPA with the Provincial Electricity Authority (PEA), for 5 years - open ended. The PPA provided for a feed-in adder of THB 8.0 on
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Raw Materials, Solar, Steel, Government
- Location
- Thailand
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SPCG Khon Kaen II Solar Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SPCG was planning the development of the 7.46MW Khon Kaen 2 solar plant. The project company is Solar Power (Bureerum 1) Company Limited ("SPKK2") Construction started in August 2012 and commercial operation was expected for January 31 2013. The projects by SPCG held a PPA with the Provincial Electricity Authority (PEA), for 5 years - open ended. The PPA provided for a feed-in adder of THB 8.0 on top of the base tariff for 10 years after commissioning. The projects receive tax benefits of 0% for the first 8 years, and half of normal tax rate for the 5 year following. Financial information was unavailable. http://www.thailand-energy-academy.org/admin/uploads/20120711034042.pdf President The Stock Exchange of Thailand SPCG Public Company Limited (the “Company”) would like to inform that the solar farm project development of the 4 projects as follows: 1. Solar Power (Korat 6) Company Limited (“SPKR6”): Construction of the 7.46-megawatt solar farm started in August 2012 and is due to commence commercial operation on 31 January 2013 2. Solar Power (Bureerum 1) Company Limited (“SPBR1”): Construction of the 7.46-megawatt solar farm started in August 2012 and is due to commence commercial operation on 31 January 2013 3. Solar Power (Bureerum 2) Company Limited (“SPBR2”): Construction of the 7.46-megawatt solar farm started in August 2012 and is due to commence commercial operation on 31 January 2013 4. Solar Power (Khon Kaen 2) Company Limited (“SPKK2”): Construction of the 7.46-megawatt solar farm started in August 2012 and is due to commence commercial operation on 31 January 2013 In this regard, all 4 solar farm projects signed a Power Purchase Agre |
Original sector | Energy |
Location
Country | Thailand |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Raw Materials, Solar, Steel, Government |
Article published date | 2024-05-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
