logo
ProjectActive

SPCG Nakthon Ratchasima & Loei Solar Plants

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Thailand-based solar developer Solar Power Company (SPC) was financed to build, own and operate two solar pv projects of 6 MW in the Nakthon Ratchasima and Loei regions. The project developer was a subsidiary of SPCG Public Company Limited, an entity partially owned by the IFC, with a 15% equity stake in the company.

The generated electricity was to be sold to the state-owned Provincial Electr

Status
Prospective
Sector
Solar, Steel, Power Generation (CCGT), Government, Commercial
Location
Thailand
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about SPCG Nakthon Ratchasima & Loei Solar Plants

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SPCG Nakthon Ratchasima & Loei Solar Plants” is an infrastructure initiative in the Solar sector, located in Thailand. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Thailand-based solar developer Solar Power Company (SPC) was financed to build, own and operate two solar pv projects of 6 MW in the Nakthon Ratchasima and Loei regions. The project developer was a subsidiary of SPCG Public Company Limited, an entity partially owned by the IFC, with a 15% equity stake in the company. The generated electricity was to be sold to the state-owned Provincial Electrical Authority (PEA). Power Purchase Agreements for all eight projects in the portfolio were signed under Thailand’s ‘Very Small Power Producer’ program. The power sales tariffs for all projects lock in the premium price of US$ 0.26/kWh. Total cost for the two projects was estimated at THB 890 million, or USD 28.8 million. Of the total, KasinBank provided USD 6.8 million, BAY and Thanachart Bank provided USD 5.2 million, while IFC lent USD 8 million and The World Bank Clean Technology Fund USD 4 million. Commissioning for the projects was scheduled for 2012. The projects by SPCG held a PPA with the Provincial Electricity Authority (PEA), for 5 years - open ended. The PPA provided for a feed-in adder of THB 8.0 on top of the base tariff for 10 years after commissioning. The projects receive tax benefits of 0% for the first 8 years, and half of normal tax rate for the 5 year following. In May 2012, it was reported that the firm started construction on 4 solar plants of 7.46MW each (29.9MW) which were commissioned in August 2012, holding a PPA with PEA, including a 10 year adder tariff of THB 8 ($0.26) per kWh. Total cost of these projects were unknown, but ESTIMATED here at US$84 million, of which 28.8 million was already accounted for. The reported D/E ratio of Loei 1 was 70/30. http://origin-www.bloomberg.com/apps/news?pid=conewsstory&tkr=TCAP:TB&sid=aUv7rJAW7wug http://origin-www.bloomberg.com/apps/news?pid=conewsstory&tkr=TCAP:TB&sid=aUv7rJAW7wug

Original sector

Energy

Budget

Location

Country

Thailand

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Steel, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project