logo

SPCG Nakthon Ratchasima & Loei Solar Plants

Sector: Solar • Location: Thailand

Source: World Bank Group

Project
Active

Thailand-based solar developer Solar Power Company (SPC) was financed to build, own and operate two solar pv projects of 6 MW in the Nakthon Ratchasima and Loei regions. The project developer was a subsidiary of SPCG Public Company Limited, an entity partially owned by the IFC, with a 15% equity stake in the company.

The generated electricity was to be sold to the state-owned Provincial Electr

Project Information FAQ

Project Information

5 Q
The project “SPCG Nakthon Ratchasima & Loei Solar Plants” is an infrastructure initiative in the Solar sector, located in Thailand. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Thailand-based solar developer Solar Power Company (SPC) was financed to build, own and operate two solar pv projects of 6 MW in the Nakthon Ratchasima and Loei regions. The project developer was a subsidiary of SPCG Public Company Limited, an entity partially owned by the IFC, with a 15% equity stake in the company. The generated electricity was to be sold to the state-owned Provincial Electrical Authority (PEA). Power Purchase Agreements for all eight projects in the portfolio were signed under Thailand’s ‘Very Small Power Producer’ program. The power sales tariffs for all projects lock in the premium price of US$ 0.26/kWh. Total cost for the two projects was estimated at THB 890 million, or USD 28.8 million. Of the total, KasinBank provided USD 6.8 million, BAY and Thanachart Bank provided USD 5.2 million, while IFC lent USD 8 million and The World Bank Clean Technology Fund USD 4 million. Commissioning for the projects was scheduled for 2012. The projects by SPCG held a PPA with the Provincial Electricity Authority (PEA), for 5 years - open ended. The PPA provided for a feed-in adder of THB 8.0 on top of the base tariff for 10 years after commissioning. The projects receive tax benefits of 0% for the first 8 years, and half of normal tax rate for the 5 year following. In May 2012, it was reported that the firm started construction on 4 solar plants of 7.46MW each (29.9MW) which were commissioned in August 2012, holding a PPA with PEA, including a 10 year adder tariff of THB 8 ($0.26) per kWh. Total cost of these projects were unknown, but ESTIMATED here at US$84 million, of which 28.8 million was already accounted for. The reported D/E ratio of Loei 1 was 70/30. http://origin-www.bloomberg.com/apps/news?pid=conewsstory&tkr=TCAP:TB&sid=aUv7rJAW7wug http://origin-www.bloomberg.com/apps/news?pid=conewsstory&tkr=TCAP:TB&sid=aUv7rJAW7wug

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data