Speaker Assembly Factory / formalocal
Sector: Power Generation (CCGT)
Source: ArchDaily
The building is organized based on a rational rectangular plan made up of five load-bearing bays. Its asymmetrical double-pitched roof echoes the traditional forms of Landes farmhouses. The treatment of the facades expresses a dichotomy between the gable ends and the long walls, which energizes its perception on the site.To the east and west, the raw concrete gable ends affirm the building's stabi
- Status
- Closed
- Sector
- Power Generation (CCGT), Seaport, Metal, Manufacturing (Industrial), Residential, Cement, Commercial
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Speaker Assembly Factory / formalocal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The building is organized based on a rational rectangular plan made up of five load-bearing bays. Its asymmetrical double-pitched roof echoes the traditional forms of Landes farmhouses. The treatment of the facades expresses a dichotomy between the gable ends and the long walls, which energizes its perception on the site.To the east and west, the raw concrete gable ends affirm the building's stability. They are recessed in the center to frame the two large glazed entrances on the ground floor and to offer terrace and social spaces on the office floor above.With an area of 1215 m², the building is spread over two levels. The ground floor accommodates the entire industrial program, with double-height storage and a showroom. The first floor is dedicated to the office section of the program, with offices facing north, offering views of the maritime pines in the Landes forest.Text description provided by the architects.Located within the extension of the Pédebert business district in Soorts, the Stereo building houses the production site of the speaker manufacturer La Boite Concept / CCLAB.The metal facades of the long walls express a composition woven between the vertical rhythm of the building's structural grid and the horizontality of the floor, base, and sill lines. The facades are made with an alternation of infills, glazed, cladded, or polycarbonate. |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Seaport, Metal, Manufacturing (Industrial), Residential, Cement, Commercial |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- A Bridge Home Projects
- Site C Worker Accommodation
- Canadian Tire Corporate Office Interior Renovation
