logo
ProjectClosed

Speaker Assembly Factory / formalocal

Sector: Power Generation (CCGT)

Source: ArchDaily

The building is organized based on a rational rectangular plan made up of five load-bearing bays. Its asymmetrical double-pitched roof echoes the traditional forms of Landes farmhouses. The treatment of the facades expresses a dichotomy between the gable ends and the long walls, which energizes its perception on the site.To the east and west, the raw concrete gable ends affirm the building's stabi

Status
Closed
Sector
Power Generation (CCGT), Seaport, Metal, Manufacturing (Industrial), Residential, Cement, Commercial
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about Speaker Assembly Factory / formalocal

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Speaker Assembly Factory / formalocal” is an infrastructure initiative in the Power Generation (CCGT) sector. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The building is organized based on a rational rectangular plan made up of five load-bearing bays. Its asymmetrical double-pitched roof echoes the traditional forms of Landes farmhouses. The treatment of the facades expresses a dichotomy between the gable ends and the long walls, which energizes its perception on the site.To the east and west, the raw concrete gable ends affirm the building's stability. They are recessed in the center to frame the two large glazed entrances on the ground floor and to offer terrace and social spaces on the office floor above.With an area of 1215 m², the building is spread over two levels. The ground floor accommodates the entire industrial program, with double-height storage and a showroom. The first floor is dedicated to the office section of the program, with offices facing north, offering views of the maritime pines in the Landes forest.Text description provided by the architects.Located within the extension of the Pédebert business district in Soorts, the Stereo building houses the production site of the speaker manufacturer La Boite Concept / CCLAB.The metal facades of the long walls express a composition woven between the vertical rhythm of the building's structural grid and the horizontality of the floor, base, and sill lines. The facades are made with an alternation of infills, glazed, cladded, or polycarbonate.

Location

Not available for this record.

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Seaport, Metal, Manufacturing (Industrial), Residential, Cement, Commercial

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project