Speculative Industrial Building #1
One of 10,000+ projects Taiyo tracks in Michigan.
Source: Dodge USA
Site Area: 48 Acres - Total S.F.: 300,000 SF - Office Space: 2,500 SF (TBD) - Ceiling Height: 32 FT Clear - Column Spacing: 50' x 50' - Dock Doors: 24 (24 Additional Knockouts) -Overhead Doors: 4 locations - Fire Suppression: ESFR - Electric Service: 1,800 Amp/450V/3P - Lighting: LED - Floors: 6" Base Build - Climate Control: HVAC in Office & Thermocycler heating in Manufacturing
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Warehouse, Residential, Commercial, Steel
- Location
- Mattawan, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Speculative Industrial Building 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Site Area: 48 Acres - Total S.F.: 300,000 SF - Office Space: 2,500 SF (TBD) - Ceiling Height: 32 FT Clear - Column Spacing: 50' x 50' - Dock Doors: 24 (24 Additional Knockouts) -Overhead Doors: 4 locations - Fire Suppression: ESFR - Electric Service: 1,800 Amp/450V/3P - Lighting: LED - Floors: 6" Base Build - Climate Control: HVAC in Office & Thermocycler heating in Manufacturing |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Mattawan |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Warehouse, Residential, Commercial, Steel |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
