Spencefield WPCP Facility Abandonment
Sector: Manufacturing (Industrial) • Location: Moultrie, Georgia, United States of America
Source: Dodge USA
The Work To Be Done shall consist of furnishing all products and performing all labor necessary to dredge/degrade the ponds at the Spence Field WPCP for complete sludge removal for the purpose of abandoning the facility. Work shall also include the proper restoration of pond volume by methods that include disposal, dewatering of sludge removed, grit removal, sludge degradation of solids, and all o
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Government
- Location
- Moultrie, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Spencefield WPCP Facility Abandonment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work To Be Done shall consist of furnishing all products and performing all labor necessary to dredge/degrade the ponds at the Spence Field WPCP for complete sludge removal for the purpose of abandoning the facility. Work shall also include the proper restoration of pond volume by methods that include disposal, dewatering of sludge removed, grit removal, sludge degradation of solids, and all other appurtenances necessary to complete the project in accordance with the specifications and co... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Moultrie |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Government |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
