Spencer Street Improvements
Sector: Government • Location: Las Vegas, Nevada, United States of America
Source: Dodge USA
607070-24 (SPENCER STREET, RUSSELL ROAD TO TWAIN AVENUE) The work to be performed under this contract consists of mill and overlay with UTACS as well as removing and replacing plantmix bituminous surface in various locations, bring sidewalk ramps up to ADA standards, removing and replacing sidewalk, curb, gutter, spandrels/cross gutters, medians, light fixtures, traffic control devices and pavemen
- Status
- Closed
- Sector
- Government, Road, Car parking, Commercial, Automotive, Manufacturing (Industrial)
- Location
- Las Vegas, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Spencer Street Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 607070-24 (SPENCER STREET, RUSSELL ROAD TO TWAIN AVENUE) The work to be performed under this contract consists of mill and overlay with UTACS as well as removing and replacing plantmix bituminous surface in various locations, bring sidewalk ramps up to ADA standards, removing and replacing sidewalk, curb, gutter, spandrels/cross gutters, medians, light fixtures, traffic control devices and pavement markings. In addition, this contract includes, traffic signal modifications, installation ITS i... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Las Vegas |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Road, Car parking, Commercial, Automotive, Manufacturing (Industrial) |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- SR 2 FM SR 15 IN CLAYTON TO SOUTH CAROLINA STATE LINE
