Spiceland Hotel Project - Infrastructure Work
Sector: Water Supply and Storage • Location: Spiceland, Indiana, United States of America
Source: Dodge
general scopes of work : - All utility site work within 2 of the building . - All surveying and s taking other than the building . - All material, labor and equipment to construct the d rive from State Road 3 , including the parking lot associated with the new development : Tree Clearing Demolition Strip Topsoil Soil Erosion Control Earthwork Concrete Curb Asphalt Parking Lot Construction (includi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | general scopes of work : - All utility site work within 2 of the building . - All surveying and s taking other than the building . - All material, labor and equipment to construct the d rive from State Road 3 , including the parking lot associated with the new development : Tree Clearing Demolition Strip Topsoil Soil Erosion Control Earthwork Concrete Curb Asphalt Parking Lot Construction (including Asphalt) Install Storm Install Sewer Install Watermain Install Sanitary Sewer Final Grading - ... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
