Spring Creek Parkway Improvements Phase 2
Sector: Water Supply and Storage • Location: Clarksville, Tennessee, United States of America
Source: Dodge
The work to be performed (Work) consists of construction of approximately 1.199 miles of 4-lane boulevard section on a new alignment. The project includes the following work: Grading, Paving, Striping, Drain, Curb and Gutter, Sidewalk, Multi-Use Path, Lighting, Utility Installations (Water, Sanitary Sewer, Natural Gas), 2-681 ft. steel bridge structures, and Stabilization as shown on the Drawings
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Steel, Natural Gas, Bridge, Car parking, Commercial, Waste Processing and Treatment, Road, Metal, Automotive, Power Transmission, Power Generation (CCGT)
- Location
- Clarksville, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Spring Creek Parkway Improvements Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed (Work) consists of construction of approximately 1.199 miles of 4-lane boulevard section on a new alignment. The project includes the following work: Grading, Paving, Striping, Drain, Curb and Gutter, Sidewalk, Multi-Use Path, Lighting, Utility Installations (Water, Sanitary Sewer, Natural Gas), 2-681 ft. steel bridge structures, and Stabilization as shown on the Drawings and as set out more fully in the Specifications. Contractor shall provide all necessary materials... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Clarksville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Steel, Natural Gas, Bridge, Car parking, Commercial, Waste Processing and Treatment, Road, Metal, Automotive, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
