logo
ProjectClosed

Spring Creek Sewer Line Interceptor Phase 1

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

The City of Plano is soliciting a low bid to install approximately 1100 LF of 42-inch FRP to replace existing 33-inch sewer line. The proposed interceptor will add required sewer capacity and remove bottlenecks within the system that were identified in the wastewater master plan. The new line will be installed by open cut method and will require bypass pumping operations to make connections to the

Status
Closed
Sector
Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
Location
Plano, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Spring Creek Sewer Line Interceptor Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Spring Creek Sewer Line Interceptor Phase 1” is an infrastructure initiative in the Water Supply and Storage sector, located in Plano, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City of Plano is soliciting a low bid to install approximately 1100 LF of 42-inch FRP to replace existing 33-inch sewer line. The proposed interceptor will add required sewer capacity and remove bottlenecks within the system that were identified in the wastewater master plan. The new line will be installed by open cut method and will require bypass pumping operations to make connections to the existing system. SPRING CREEK INTERCEPTOR, PHASE 1 PLANO PKWY & ACCENT DRIVE, TX.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Plano

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Waste Processing and Treatment, Commercial

Article published date

2025-01-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project