Spring Creek Wastewater Treatment Facility REBID
Sector: Water Supply and Storage • Location: Pierre, South Dakota, United States of America
Source: Dodge USA
The Project consists of the following scope of work.The Project consists of the installation of a pre-manufactured wastewater treatment plant, construction of approximately 4200 feet of 4-inch forcemain, construction of a maintenance building, an effluent pump station, earthwork and grading, valves, electrical work, dewatering, testing, site work, cleanup, and other appurtenant items. The site is
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Pierre, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Spring Creek Wastewater Treatment Facility REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of the following scope of work.The Project consists of the installation of a pre-manufactured wastewater treatment plant, construction of approximately 4200 feet of 4-inch forcemain, construction of a maintenance building, an effluent pump station, earthwork and grading, valves, electrical work, dewatering, testing, site work, cleanup, and other appurtenant items. The site is located approximately 15 miles northwest of the City of Pierre in Sully and Hughes Counties, Sout... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Pierre |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
