Spring Hill School Conditional Use Permit Modification
Sector: Power Transmission • Location: California, United States of America (USA)
Source: City of Petaluma
The proposed project requests modification of the existing vested Spring Hill School Conditional Use Permit (Planning Commission Resolution No. 2017-20) to allow the operation of a summer camp for school-aged children consistent with the programs accredited by the American Camping Association and overseen by the California Department of Public Health. The summer camp would be limited to nine conse
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed project requests modification of the existing vested Spring Hill School Conditional Use Permit (Planning Commission Resolution No. 2017-20) to allow the operation of a summer camp for school-aged children consistent with the programs accredited by the American Camping Association and overseen by the California Department of Public Health. The summer camp would be limited to nine consecutive weeks between the months of June and August annually, with registration limited to a maximum of 70 campers supported by seven staff members. Summer camp activities would utilize existing classrooms, playfield, and courtyard/lunch areas. The proposed hours for the camp would be Monday through Friday, 7:30 AM to 6:00 PM, which coincides with the existing school hours of operations. Drop-off (8:30-9:30 AM) and pick-up (4:00-5:30 PM) would occur using the existing on-site, one-way drive aisle, and staff would supervise camper arrivals and departures. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Transmission projects in United States of America (USA)
- Memorial Drive from BW 8 to Tallowood Road
- Odessa Utility Coordination
- SH 105 - I-45 to North Frazier Street -SH 75
- Pierce County Sewer and Traffic Operations Facility
- Aberdeen Public Health Center
- Blue Island Senior Living Facility at Fay’s Point
- Data Centers Communications Firm Data Center
- Upper Guadalupe River Flood Risk Management Reformulation Study
