logo
ProjectClosed

Spring Lake Brook Reconstruction

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The work to be performed under this contract includes the replacement of an existing steel beam and wooden plank spillway of a pond situated onstream of the Spring Lake Brook with a concrete spillway, downstream of Parsons Pond. Principal items of work in the project include: 480 C.Y. Excavation, Unclassified 160 C.Y. I-9 Soil Aggregate 20 C.Y. Coarse Aggregate No. 57 60 C.Y. Concrete Footing 30 C

Status
Closed
Sector
Steel, Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Metal, Commercial
Location
Franklin Lakes, New Jersey, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Spring Lake Brook Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Spring Lake Brook Reconstruction” is an infrastructure initiative in the Steel sector, located in Franklin Lakes, New Jersey, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work to be performed under this contract includes the replacement of an existing steel beam and wooden plank spillway of a pond situated onstream of the Spring Lake Brook with a concrete spillway, downstream of Parsons Pond. Principal items of work in the project include: 480 C.Y. Excavation, Unclassified 160 C.Y. I-9 Soil Aggregate 20 C.Y. Coarse Aggregate No. 57 60 C.Y. Concrete Footing 30 C.Y. Concrete Wing Wall 12 C.Y. Concrete Apron 10,000 L.B. Reinforcement Steel, Epoxy-Coated The p...

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Jersey

City

Franklin Lakes

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Steel, Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Metal, Commercial

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project