Spring Lake Middle School Walk-In Cooler / Freezer Remodel
Sector: Power Generation (CCGT) • Location: Spring Lake, North Carolina, United States of America
Source: Dodge
This work will include the removal of an existing combo cooler / freezer to be replaced with a new walk-in freezer with an internal ramp in the Kitchen. A new cooler will be installed in the existing Staff Lounge. New ACT and grid will be installed with new light fixtures in the Staff Lounge. Power will be fed from the existing Electrical Room to the new cooler.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | bid results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This work will include the removal of an existing combo cooler / freezer to be replaced with a new walk-in freezer with an internal ramp in the Kitchen. A new cooler will be installed in the existing Staff Lounge. New ACT and grid will be installed with new light fixtures in the Staff Lounge. Power will be fed from the existing Electrical Room to the new cooler. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
