Spring St & Main St Improvements
Sector: Metal • Location: Somerset, Wisconsin, United States of America
Source: Dodge USA
The work for which bids are asked includes the following: Remove and Replace Concrete Curb 3,800 LF Remove and Replace Concrete Walk 38,000 SF Asphaltic Concrete Street Patching 750 Ton Traffic Signal Standards Aluminum 15-FT 1 EA Rewire Traffic Signals 1 LS Remove, Salvage and Reinstall Traffic Signal Equipment 2 EA Remove, Salvage and Reinstall Traffic Signal Control Cabinet 1 EA and other ancil
- Status
- Closed
- Sector
- Metal, Cement, Road, Steel, Car parking, Government, Automotive, Commercial
- Location
- Somerset, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Spring St & Main St Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work for which bids are asked includes the following: Remove and Replace Concrete Curb 3,800 LF Remove and Replace Concrete Walk 38,000 SF Asphaltic Concrete Street Patching 750 Ton Traffic Signal Standards Aluminum 15-FT 1 EA Rewire Traffic Signals 1 LS Remove, Salvage and Reinstall Traffic Signal Equipment 2 EA Remove, Salvage and Reinstall Traffic Signal Control Cabinet 1 EA and other ancillary items necessary to complete the work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Somerset |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Cement, Road, Steel, Car parking, Government, Automotive, Commercial |
Article published date | 2023-05-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
