Spring Street Pumping Plant Facility Improvements
Bid results · California · Last reported Jun 2024
Source: Dodge USA
The Project will upgrade and repair the existing pumping plant and includes installation of a permanent standby generator; construction of a new below ground electrical and control room; rehabilitation of the existing sewage wetwell; replacement of three existing pumps and associated piping; civil site improvements; upgrades to the existing electrical, instrumentation, and mechanical systems, and
- Status
- Closed
- Sector
- Power Generation (CCGT), Road, Waste Processing and Treatment, Government, Commercial, Water Supply and Storage
- Location
- Signal Hill, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Spring Street Pumping Plant Facility Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project will upgrade and repair the existing pumping plant and includes installation of a permanent standby generator; construction of a new below ground electrical and control room; rehabilitation of the existing sewage wetwell; replacement of three existing pumps and associated piping; civil site improvements; upgrades to the existing electrical, instrumentation, and mechanical systems, and all appurtenant work. The permanent standby generator, sewage pumps, and check valves will be fur... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Signal Hill |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Waste Processing and Treatment, Government, Commercial, Water Supply and Storage |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
