Spring Valley Flamingo Cimarron Branch Flood Control
Sector: Water Supply and Storage • Location: Spring Valley, Nevada, United States of America
Source: Dodge USA
Tropicana Flamingo Project Flamingo Cimarron Branch (PV = 74.0) FLCM 0003 This project consists of 84 diameter reinforced concrete pipe storm drain on the west side of Cimarron Road from Russell Road to Patrick Lane. Design is programmed in FY 23/24 and construction funding is programmed in FY 25/26. The TYCP includes approximately $3.5 million for this project.Tropicana Flamingo Project Flamingo
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Solar, Government, Commercial
- Location
- Spring Valley, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Spring Valley Flamingo Cimarron Branch Flood Control
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Tropicana Flamingo Project Flamingo Cimarron Branch (PV = 74.0) FLCM 0003 This project consists of 84 diameter reinforced concrete pipe storm drain on the west side of Cimarron Road from Russell Road to Patrick Lane. Design is programmed in FY 23/24 and construction funding is programmed in FY 25/26. The TYCP includes approximately $3.5 million for this project.Tropicana Flamingo Project Flamingo Cimarron Branch (PV = 87.0) FLCM 0003 This project consists of 84 diameter reinforced concrete pi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Spring Valley |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Solar, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
