Spring Valley Flume Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Project Description: In accordance with plans and specifications prepared by GHD, Inc, the Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of removal of existing timber and elevated flume; construction of steel substructure and a new steel half round pipe (Lennon Flume) to convey water, two (2) new transition structures, support
- Status
- Closed
- Sector
- Forest Products and Packaging, Water Supply and Storage, Steel, Waste Processing and Treatment, Government, Metal, Commercial
- Location
- Auburn, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Spring Valley Flume Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Description: In accordance with plans and specifications prepared by GHD, Inc, the Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of removal of existing timber and elevated flume; construction of steel substructure and a new steel half round pipe (Lennon Flume) to convey water, two (2) new transition structures, supports to avoid the creek zone (environmental exclusion zone), and erosion control for new spillway. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Auburn |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Water Supply and Storage, Steel, Waste Processing and Treatment, Government, Metal, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in United States of America
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- CS 560/PINE STREET IN LUMBER CITY - TIA
- RENWICK STREET FROM W RAILROAD STREET TO JONES STREET - TIA
- Paper Work
- 2501 Garden Highway Garage
- CR 473/SWAMP ROAD @ GUM SWAMP
- CR 265/PAPER MILL RD FM CR 244/SPRING LAKE TO CS 967/EZZARD
- Cooperative Agreement for Odometer Fraud Investigations
