Springer Hill Road Drainage Pipe Replacement Project
Sector: Bridge • Location: Missouri, United States
Source: California Democrat
Demolition of existing drainage pipe and installation of a new precast concrete box culvert with incidental site work on Springer Hill Road. The project has a completion timeline of 45 calendar days or until August 15, 2026.
- Status
- Closed
- Sector
- Bridge, Cement
- Location
- Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- California Democrat
ConstructChat
Ask ConstructChat about Springer Hill Road Drainage Pipe Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demolition of existing drainage pipe and installation of a new precast concrete box culvert with incidental site work on Springer Hill Road. The project has a completion timeline of 45 calendar days or until August 15, 2026. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | California Democrat |
URL |
More Details
Record type | Project |
Sector | Bridge, Cement |
Article published date | 2026-05-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States
- Bayou Bridge Pipeline Project, Louisiana
- Ashland Refinery Expansion, Garyville, Louisiana
- South Lander Street Bridge Project, Seattle, US
- Lewisville Lake Toll Bridge
- Winston-Salem Northern Beltway, North Carolina
- Interstate 39/90 Reconstruction Project
- I-64/I-264 Interchange Improvements Project, Virginia, US
- Highway 371 Expansion, Minnesota, US
