Springfield -Water System Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Construction of a new centralized water treatment plant including HVAC, electrical, and plumbing, installation of filter skids for treatment of solids, iron, and radium removal, associated chemical metering and feed equipment, process piping and appurtenances, installation of backwash waste equipment, coordination of the procurement of a new electrical transformer and electrical service, installat
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial), Commercial, Metal, Government, Steel
- Location
- Springfield, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Springfield -Water System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a new centralized water treatment plant including HVAC, electrical, and plumbing, installation of filter skids for treatment of solids, iron, and radium removal, associated chemical metering and feed equipment, process piping and appurtenances, installation of backwash waste equipment, coordination of the procurement of a new electrical transformer and electrical service, installation and integration of instrumentation, controls, and SCADA, installation of water distribution s... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Springfield |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial), Commercial, Metal, Government, Steel |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
