logo
ProjectClosed

Springfield FY 25 Sewer Infrastructure Improvements

Closed · Massachusetts · Last reported Jul 2025

Source: Dodge

The nature and general scope of work of the Contract includes sewer system pipe repairs and rehabilitation at various locations in Springfield MA. Approximately 330 feet of 10 to 18 inch sewer pipe replacement, 2 new sewer manholes, 6,400 feet of 10 to 24 inch sewer pipe rehabilitation, 400 vertical feet of manhole rehabilitation, and 300 feet of 6 to 8 inch DIP water main replacement to facilitat

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Commercial
Location
Springfield, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Springfield FY 25 Sewer Infrastructure Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Springfield FY 25 Sewer Infrastructure Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Springfield, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The nature and general scope of work of the Contract includes sewer system pipe repairs and rehabilitation at various locations in Springfield MA. Approximately 330 feet of 10 to 18 inch sewer pipe replacement, 2 new sewer manholes, 6,400 feet of 10 to 24 inch sewer pipe rehabilitation, 400 vertical feet of manhole rehabilitation, and 300 feet of 6 to 8 inch DIP water main replacement to facilitate sewer pipe repair.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Springfield

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Commercial

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project