Springfield Scenic Avenue Bridge Over Wilsons Creek
Sector: Water Supply and Storage • Location: Springfield, Missouri, United States of America
Source: Dodge
This project consists of the removal and replacement of the existing Scenic Avenue Bridge over Wilson s Creek. The existing structure will be replaced with a 160 foot three-span prestressed concrete girder bridge with 4 bents. The bridge includes 23,470 lbs of reinforcing steel, 91 CY of Class B and B-1 concrete, and 866 SY of concrete slab deck. The project also includes 415 LF of curb and gutter
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Steel, Government, Road, Bridge, Waste Processing and Treatment, Commercial, Car parking, Automotive, Rail, Metal
- Location
- Springfield, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Springfield Scenic Avenue Bridge Over Wilsons Creek
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the removal and replacement of the existing Scenic Avenue Bridge over Wilson s Creek. The existing structure will be replaced with a 160 foot three-span prestressed concrete girder bridge with 4 bents. The bridge includes 23,470 lbs of reinforcing steel, 91 CY of Class B and B-1 concrete, and 866 SY of concrete slab deck. The project also includes 415 LF of curb and gutter, 405 LF of Type D barrier curb, 359 LF of bridge rail concrete curb, 12,769 SF of sidewalk, 1,22... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Springfield |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Steel, Government, Road, Bridge, Waste Processing and Treatment, Commercial, Car parking, Automotive, Rail, Metal |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
