Springfield Water System Improvements
Sector: Water Supply and Storage • Location: Mount Madonna, California, United States of America
Source: Dodge
The Project includes the following Work: The project to expand and enhance the Springfield Water System includes well equipping, well modifications, two new 110,000 gallon bolted steel water storage tanks, chlorination facilities, site improvements, electrical and lighting improvements, electrical and chemical building, back-up generator, pump station, approximately 12,500 linear feet of new 6- an
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Steel, Chemical (Industrial), Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road, Metal, Manufacturing (Industrial)
- Location
- Mount Madonna, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Springfield Water System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: The project to expand and enhance the Springfield Water System includes well equipping, well modifications, two new 110,000 gallon bolted steel water storage tanks, chlorination facilities, site improvements, electrical and lighting improvements, electrical and chemical building, back-up generator, pump station, approximately 12,500 linear feet of new 6- and 8-inch potable water distribution system piping in public roads and private easements including... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Mount Madonna |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Steel, Chemical (Industrial), Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road, Metal, Manufacturing (Industrial) |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
