Springpole Gold Project
Sector: Metal • Location: Red Lake, Ontario, Canada
Source: Dodge USA
Construction, operation, decommissioning, and abandonment of an open-pit gold/silver mine and on-site metal mill, located approximately 110 kilometres northeast of Red Lake, Ontario. As proposed, the Springpole Gold Project would have an ore production capacity of 60,000 tonnes per day over an 11-year mine life. The on-site metal mill would have an ore input capacity of 44,000 tonnes per day and w
- Status
- Prospective
- Sector
- Metal, Commercial, Manufacturing (Industrial)
- Location
- Red Lake, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Springpole Gold Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction, operation, decommissioning, and abandonment of an open-pit gold/silver mine and on-site metal mill, located approximately 110 kilometres northeast of Red Lake, Ontario. As proposed, the Springpole Gold Project would have an ore production capacity of 60,000 tonnes per day over an 11-year mine life. The on-site metal mill would have an ore input capacity of 44,000 tonnes per day and would operate for 12 years. |
Budget |
Location
Country | Canada |
State | Ontario |
City | Red Lake |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
