logo
ProjectClosed

Springtree Wellfield Maintenance Improvements - Phase I

Sector: Water Supply and Storage • Location: Sunrise, Florida, United States of America

Source: Dodge USA

. The Work to be performed by the Contractor is generally described as follows: The Work to be performed under this Contract includes, but is not limited to, the construction of two prefabricated restroom facilities with all necessary utilities, and the installation of a sewer lift station at each restroom location as shown and specified in the Bid documents.

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
Location
Sunrise, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Springtree Wellfield Maintenance Improvements - Phase I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Springtree Wellfield Maintenance Improvements - Phase I” is an infrastructure initiative in the Water Supply and Storage sector, located in Sunrise, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

. The Work to be performed by the Contractor is generally described as follows: The Work to be performed under this Contract includes, but is not limited to, the construction of two prefabricated restroom facilities with all necessary utilities, and the installation of a sewer lift station at each restroom location as shown and specified in the Bid documents.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Sunrise

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project