Springtree WTP Chemical System and Building Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The existing Chemical Building at the Springtree Water Treatment Plant has deteriorated in several areas, displaying concrete cracking, roof distress and metal corrosion. On the interior, the phosphate, polymer, and flouride pumping and mixing systems are aged and in need of replacement. This concrete and steel structure has been in service since the 1970s and is in need of rehabilitation. The ele
- Status
- Prospective
- Sector
- Metal, Fertilizers, Steel, Water Supply and Storage, Chemical (Industrial), Cement, Power Generation (CCGT), Commercial, Government, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Sunrise, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Springtree WTP Chemical System and Building Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The existing Chemical Building at the Springtree Water Treatment Plant has deteriorated in several areas, displaying concrete cracking, roof distress and metal corrosion. On the interior, the phosphate, polymer, and flouride pumping and mixing systems are aged and in need of replacement. This concrete and steel structure has been in service since the 1970s and is in need of rehabilitation. The electrical distribution panels and wiring have also aged and in need of replacement. This project wi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Sunrise |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Fertilizers, Steel, Water Supply and Storage, Chemical (Industrial), Cement, Power Generation (CCGT), Commercial, Government, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
