Springtree WTP Electrical Upgrades - Phase 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Work for this project consists of, but is not limited to, replacement of the existing medium voltage main switchgear and medium voltage motor control centers with new 5kV medium voltage switchgear; Installation of new 5kV generator paralleling and load sharing switchgear and associated controls to parallel the existing generators, synchronize them with each other, and interconnect with the electri
- Status
- Prospective
- Sector
- Power Transmission, Water Supply and Storage, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment
- Location
- Sunrise, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Springtree WTP Electrical Upgrades - Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work for this project consists of, but is not limited to, replacement of the existing medium voltage main switchgear and medium voltage motor control centers with new 5kV medium voltage switchgear; Installation of new 5kV generator paralleling and load sharing switchgear and associated controls to parallel the existing generators, synchronize them with each other, and interconnect with the electrical utility; Upgrade of existing standby generator mechanical components and controls; Provision ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Sunrise |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Water Supply and Storage, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
