logo
ProjectBidding

Springtree WTP Electrical Upgrades - Phase 2

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Work for this project consists of, but is not limited to, replacement of the existing medium voltage main switchgear and medium voltage motor control centers with new 5kV medium voltage switchgear; Installation of new 5kV generator paralleling and load sharing switchgear and associated controls to parallel the existing generators, synchronize them with each other, and interconnect with the electri

Status
Prospective
Sector
Power Transmission, Water Supply and Storage, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment
Location
Sunrise, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Springtree WTP Electrical Upgrades - Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Springtree WTP Electrical Upgrades - Phase 2” is an infrastructure initiative in the Power Transmission sector, located in Sunrise, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work for this project consists of, but is not limited to, replacement of the existing medium voltage main switchgear and medium voltage motor control centers with new 5kV medium voltage switchgear; Installation of new 5kV generator paralleling and load sharing switchgear and associated controls to parallel the existing generators, synchronize them with each other, and interconnect with the electrical utility; Upgrade of existing standby generator mechanical components and controls; Provision ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Sunrise

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Transmission, Water Supply and Storage, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment

Article published date

2024-08-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project