Springtree WTP Electrical Upgrades - Phase 2
Sector: Water Supply and Storage • Location: Sunrise, Florida, United States of America
Source: Dodge USA
Work for this project consists of, but is not limited to, replacement of the existing medium voltage main switchgear and medium voltage motor control centers with new 5kV medium voltage switchgear; Installation of new 5kV generator paralleling and load sharing switchgear and associated controls to parallel the existing generators, synchronize them with each other, and interconnect with the electri
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Government, Waste Processing and Treatment, Power Generation (CCGT), Commercial
- Location
- Sunrise, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Springtree WTP Electrical Upgrades - Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work for this project consists of, but is not limited to, replacement of the existing medium voltage main switchgear and medium voltage motor control centers with new 5kV medium voltage switchgear; Installation of new 5kV generator paralleling and load sharing switchgear and associated controls to parallel the existing generators, synchronize them with each other, and interconnect with the electrical utility; Upgrade of existing standby generator mechanical components and controls; Provision ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Sunrise |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Government, Waste Processing and Treatment, Power Generation (CCGT), Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
