SPRINK 622-628 Dudley ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
install fire alarm and fire protection systems at the first floor of 622-624 Dudley St, in the existing to remain Property Management Office and adjacent Community Room – per the attached revised drawing and sketches. Note that the existing independent HVAC systems for this area are to remain and be tied into new electrical panel as needed. This supplemental instructions contains drawings and sket
- Status
- Prospective
- Sector
- Residential, Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about SPRINK 622-628 Dudley ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | install fire alarm and fire protection systems at the first floor of 622-624 Dudley St, in the existing to remain Property Management Office and adjacent Community Room – per the attached revised drawing and sketches. Note that the existing independent HVAC systems for this area are to remain and be tied into new electrical panel as needed. This supplemental instructions contains drawings and sketches |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Residential, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
