logo
ProjectOpenBP

SPRINK 8-10 Batchelder ST

Open · Massachusetts

Source: City of Boston

Replace one 1" inch flow switch not working - replace one outdated water gauge - Replace two painted 165 degree F911 residential sprinkler heads with same - install one electric bell - replace one 1/2" inch boiler drain.

Status
Prospective
Sector
Water Supply and Storage, Residential, Commercial, Government, Waste Processing and Treatment
Location
Dorchester, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about SPRINK 8-10 Batchelder ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SPRINK 8-10 Batchelder ST” is an infrastructure initiative in the Water Supply and Storage sector, located in Dorchester, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Replace one 1" inch flow switch not working - replace one outdated water gauge - Replace two painted 165 degree F911 residential sprinkler heads with same - install one electric bell - replace one 1/2" inch boiler drain.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Dorchester

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Residential, Commercial, Government, Waste Processing and Treatment

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project