Sprocket Building Seismic Improvements
Sector: Commercial • Location: Davis, California, United States of America
Source: UC Davis
Sprocket Building has been identified as a high priority, level VI rated, building for seismic improvements. Seismic Renovation Improve building strength with roof diaphragm reinforcement Reinforce connection between exterior walls and second floor Increase lateral building stability by adding shear walls on the east and west ends of the building Fire, Accessibility & Other Code Improvements The f
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Sprocket Building has been identified as a high priority, level VI rated, building for seismic improvements. Seismic Renovation Improve building strength with roof diaphragm reinforcement Reinforce connection between exterior walls and second floor Increase lateral building stability by adding shear walls on the east and west ends of the building Fire, Accessibility & Other Code Improvements The following scope will be executed in compliance with the National Fire Protection Association standards (NFPA), the California Building Code (CBC) and Americans with Disabilities Act Standards (ADA). Upgrade the existing fire alarm system Improve site accessibility and path of travel to main entry Update room signage Install accessible drinking fountains Remove and replace interior stair guardrail and handrail Electrical Panel Replacements Electrical panels that have reached end of life will be replaced to help support electrical needs throughout the building. When possible, this work may be completed on a separate timeline from the other project work to help alleviate outages during business hours. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Commercial projects in United States of America
- 2023 Citywide Pedestrian Safety Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
- FCS Child Care Project
- Brotman Hall (BH) Suite 377 Renovation
- Fine Arts and Housing Cooling Engineering Study
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
