logo
ProjectApproved

SPS System Resiliency Plan in Texas

The owner, status and timeline of this project. A free account opens every field.

Source: Stock Titan

SPS filed a System Resiliency Plan covering 2025-2028 with a proposed investment of approximately $538 million, later adjusted to $495 million approved by the Public Utilities Commission of Texas. The plan includes measures to prevent, withstand, mitigate, or recover from resiliency events including wildfire.

Status
Prospective
Sector
Energy
Location
Texas, United States of America
Updated
22 Jul 2026
Source
Stock Titan

ConstructChat

Ask ConstructChat about SPS System Resiliency Plan in Texas

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SPS System Resiliency Plan in Texas” is an infrastructure initiative in the Energy sector, located in Texas, United States. Taiyo aggregates data on it from Stock Titan.

Participants

Not available for this record.

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

SPS filed a System Resiliency Plan covering 2025-2028 with a proposed investment of approximately $538 million, later adjusted to $495 million approved by the Public Utilities Commission of Texas. The plan includes measures to prevent, withstand, mitigate, or recover from resiliency events including wildfire.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Texas

Source

Source

Stock Titan

URL

More Details

Record type

Project

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project