Spud Valley Solar Project
The owner, status and timeline of this project. A free account opens every field.
Source: Alamosa Citizen
NextEra Energy is planning a massive solar generation and solar storage facility with a maximum capacity of 600 megawatts each for solar power and solar storage. The project is located off Lane 2N between County Road 104 and County Road 108 in unincorporated Alamosa County, Colorado. It covers four square miles and involves 10 different landowners. The project aims to connect to the existing Publi
- Status
- Prospective
- Sector
- Power Generation (CCGT), Road, Solar
- Location
- Alamosa County, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Alamosa Citizen
ConstructChat
Ask ConstructChat about Spud Valley Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | NextEra Energy is planning a massive solar generation and solar storage facility with a maximum capacity of 600 megawatts each for solar power and solar storage. The project is located off Lane 2N between County Road 104 and County Road 108 in unincorporated Alamosa County, Colorado. It covers four square miles and involves 10 different landowners. The project aims to connect to the existing Public Service Co. and Xcel Energy substation adjacent to the site. Construction is hoped to begin by mid-2027 with operations starting in 2028. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Colorado |
City | Alamosa County |
Source
Source | Alamosa Citizen |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Solar |
Article published date | 2025-11-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States
- Fort Hood Military Base, Texas
- Grand Forks Air Force Base, North Dakota
- Kings Bay Naval Submarine Base
- Beaumont Refinery Expansion, Texas
- Dakota Prairie Refinery, Stark County, North Dakota
- Monkey Island LNG Terminal, Louisiana
- Midcontinent Express Pipeline (MEP), Oklahoma
- Jacksonville LNG Project, Jacksonville, Florida
