Spur 399 Expansion Project
Sector: Airport • Location: McKinney, Texas, United States
Source: NBC 5 Dallas-Fort Worth
The Texas Department of Transportation (TxDOT) is starting construction on the Spur 399 expansion in Collin County, Texas. The initial phase involves widening Spur 399 and State Highway 5 between Stewart Road and Eldorado Parkway from four lanes to six lanes. This segment is just under two miles and is expected to take about three years to complete, with a projected finish date in early 2029. The
- Status
- Under Construction
- Sector
- Airport, Road, Power Transmission, Power Generation (CCGT), Government
- Location
- McKinney, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- NBC 5 Dallas-Fort Worth
ConstructChat
Ask ConstructChat about Spur 399 Expansion Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Texas Department of Transportation (TxDOT) is starting construction on the Spur 399 expansion in Collin County, Texas. The initial phase involves widening Spur 399 and State Highway 5 between Stewart Road and Eldorado Parkway from four lanes to six lanes. This segment is just under two miles and is expected to take about three years to complete, with a projected finish date in early 2029. The project is part of a larger effort to extend Spur 399 east of McKinney, eventually connecting it to U.S. 380 and looping around the McKinney National Airport. The completed freeway will stretch over six miles with a total estimated cost of $967.1 million, covering right-of-way acquisition, utility relocation, design, and construction. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | McKinney |
Source
Source | NBC 5 Dallas-Fort Worth |
URL |
More Details
Record type | Project |
Sector | Airport, Road, Power Transmission, Power Generation (CCGT), Government |
Article published date | 2025-06-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
