Squamish - Xwu’nekw Park Sea Dike at Mamquam Blind Channel

Sector: Hydro • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
In Progress

The project will construct a sea dyke at the Xwu’nekw Park at Mamquam Blind Channel and provide flood protection to the densely populated downtown area against sea-level rise. The dyke will protect approximately 100 businesses, BC Hydro’s substation, a sanitary lift pump, and other infrastructure from coastal flooding. The earthfill dam will also provide stability to the park land and enhance mari

Project Information FAQ

Project Information

3 Q
The project “Squamish - Xwu’nekw Park Sea Dike at Mamquam Blind Channel” is an infrastructure initiative in the Hydro sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project will construct a sea dyke at the Xwu’nekw Park at Mamquam Blind Channel and provide flood protection to the densely populated downtown area against sea-level rise. The dyke will protect approximately 100 businesses, BC Hydro’s substation, a sanitary lift pump, and other infrastructure from coastal flooding. The earthfill dam will also provide stability to the park land and enhance marine habitat. The project will complete an approximately 200m section of sea dike as a phase of a larger project that will construct 7km of dike at completion of all phases. The attached Climate Resilience Assessment has been completed for the entire 7km dike, but specific risk and mitigation portions were completed for the 200m section covered under this project. The project works include: - Site preparation, mobilization and demobilization; - Project planning, design and engineering works; - Environmental protection works; - Installation of approximately 200 m Sheet pile wall; - Installation of concrete reinforcement, C- channel, anchors and foundation improvements; - Supply and compaction of earth filling; - Construction of walkway; - Site improvements including topsoil, grading and hydroseeding; - Park improvements including Installation of lighting, trees and benches; and, - related works.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data