logo

Squamish River Dike Raising - Upper Jimmy Jimmy (Judd) Slough

Sector: Government • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Pre-Construction

The proposed project will raise approximately 900 metres of the Squamish River dike at an extremely high-hazard location where dike failure could result in loss of life, cause direct damages to buildings and infrastructure totaling $190M (2016$) and displace some 7,000 people in the community nodes of Brackendale, Garibaldi Estates, and the popular public Eagle Viewing Area as well as Squamish Nat

Status
Prospective
Sector
Government
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Squamish River Dike Raising - Upper Jimmy Jimmy (Judd) Slough

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Squamish River Dike Raising - Upper Jimmy Jimmy (Judd) Slough” is an infrastructure initiative in the Government sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project will raise approximately 900 metres of the Squamish River dike at an extremely high-hazard location where dike failure could result in loss of life, cause direct damages to buildings and infrastructure totaling $190M (2016$) and displace some 7,000 people in the community nodes of Brackendale, Garibaldi Estates, and the popular public Eagle Viewing Area as well as Squamish Nation Reserves Aikwucks I.R. No. 15, Seaichem I.R. No. 15, and Kowtain I.R. No. 14. This project will build on previous upgrades to attain the target level of protection adopted in the District of Squamish 2017 Integrated Flood Hazard Management Plan. The level of protection adopted in the IFHMP was selected based on community engagement and a Quantitative Risk Assessment that considered the potential for larger and more frequent floods occurring in the future. The reach of dike proposed for this project will be the first section of dike to reach the intended level of protection. Project Works: - Raise approximately 900 metres of the Squamish River dike - Widen dike crest from 4 metres to 6 metres - Provide rip-rap erosion protection for the raised portion of the dike - Add new vehicle turnout - Upgrade one access ramp

Original sector

Climate Resilience

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Government

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project