Squamish River Dike Raising - Upper Jimmy Jimmy (Judd) Slough
Sector: Government • Location: British Columbia, Canada
Source: Infrastructure Canada
The proposed project will raise approximately 900 metres of the Squamish River dike at an extremely high-hazard location where dike failure could result in loss of life, cause direct damages to buildings and infrastructure totaling $190M (2016$) and displace some 7,000 people in the community nodes of Brackendale, Garibaldi Estates, and the popular public Eagle Viewing Area as well as Squamish Nat
- Status
- Prospective
- Sector
- Government
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Squamish River Dike Raising - Upper Jimmy Jimmy (Judd) Slough
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project will raise approximately 900 metres of the Squamish River dike at an extremely high-hazard location where dike failure could result in loss of life, cause direct damages to buildings and infrastructure totaling $190M (2016$) and displace some 7,000 people in the community nodes of Brackendale, Garibaldi Estates, and the popular public Eagle Viewing Area as well as Squamish Nation Reserves Aikwucks I.R. No. 15, Seaichem I.R. No. 15, and Kowtain I.R. No. 14. This project will build on previous upgrades to attain the target level of protection adopted in the District of Squamish 2017 Integrated Flood Hazard Management Plan. The level of protection adopted in the IFHMP was selected based on community engagement and a Quantitative Risk Assessment that considered the potential for larger and more frequent floods occurring in the future. The reach of dike proposed for this project will be the first section of dike to reach the intended level of protection. Project Works: - Raise approximately 900 metres of the Squamish River dike - Widen dike crest from 4 metres to 6 metres - Provide rip-rap erosion protection for the raised portion of the dike - Add new vehicle turnout - Upgrade one access ramp |
Original sector | Climate Resilience |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in Canada
- Winnipeg East District Police Station
- Illusuak Cultural Centre
- Transport and Rescue Squadron Fixed Wing Hangar - 19 Wing CFB 422 Comox
- Wood Buffalo Water Treatment Plant Expansion
- Coca-Cola Centre
- Children's and Women's Clinical Support Building
- Alberta Schools Alternative Procurement Phase 2
- New Central Library & Library Plaza - LRT Encapsulation
