logo

Squamish River Dike Raising - Upper Jimmy Jimmy (Judd) Slough

Sector: Government • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Pre-Construction

The proposed project will raise approximately 900 metres of the Squamish River dike at an extremely high-hazard location where dike failure could result in loss of life, cause direct damages to buildings and infrastructure totaling $190M (2016$) and displace some 7,000 people in the community nodes of Brackendale, Garibaldi Estates, and the popular public Eagle Viewing Area as well as Squamish Nat

Project Information FAQ

Project Information

5 Q
The project “Squamish River Dike Raising - Upper Jimmy Jimmy (Judd) Slough” is an infrastructure initiative in the Government sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project will raise approximately 900 metres of the Squamish River dike at an extremely high-hazard location where dike failure could result in loss of life, cause direct damages to buildings and infrastructure totaling $190M (2016$) and displace some 7,000 people in the community nodes of Brackendale, Garibaldi Estates, and the popular public Eagle Viewing Area as well as Squamish Nation Reserves Aikwucks I.R. No. 15, Seaichem I.R. No. 15, and Kowtain I.R. No. 14. This project will build on previous upgrades to attain the target level of protection adopted in the District of Squamish 2017 Integrated Flood Hazard Management Plan. The level of protection adopted in the IFHMP was selected based on community engagement and a Quantitative Risk Assessment that considered the potential for larger and more frequent floods occurring in the future. The reach of dike proposed for this project will be the first section of dike to reach the intended level of protection. Project Works: - Raise approximately 900 metres of the Squamish River dike - Widen dike crest from 4 metres to 6 metres - Provide rip-rap erosion protection for the raised portion of the dike - Add new vehicle turnout - Upgrade one access ramp

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data