Squamish River Dike Raising - Upper Jimmy Jimmy (Judd) Slough
Sector: Government • Location: British Columbia, Canada
Source: Infrastructure Canada
The proposed project will raise approximately 900 metres of the Squamish River dike at an extremely high-hazard location where dike failure could result in loss of life, cause direct damages to buildings and infrastructure totaling $190M (2016$) and displace some 7,000 people in the community nodes of Brackendale, Garibaldi Estates, and the popular public Eagle Viewing Area as well as Squamish Nat
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | pre-construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed project will raise approximately 900 metres of the Squamish River dike at an extremely high-hazard location where dike failure could result in loss of life, cause direct damages to buildings and infrastructure totaling $190M (2016$) and displace some 7,000 people in the community nodes of Brackendale, Garibaldi Estates, and the popular public Eagle Viewing Area as well as Squamish Nation Reserves Aikwucks I.R. No. 15, Seaichem I.R. No. 15, and Kowtain I.R. No. 14. This project will build on previous upgrades to attain the target level of protection adopted in the District of Squamish 2017 Integrated Flood Hazard Management Plan. The level of protection adopted in the IFHMP was selected based on community engagement and a Quantitative Risk Assessment that considered the potential for larger and more frequent floods occurring in the future. The reach of dike proposed for this project will be the first section of dike to reach the intended level of protection. Project Works: - Raise approximately 900 metres of the Squamish River dike - Widen dike crest from 4 metres to 6 metres - Provide rip-rap erosion protection for the raised portion of the dike - Add new vehicle turnout - Upgrade one access ramp |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
