logo
ProjectUnder Construction

SR 10 LOOP EB & WB @ SR 8/US 29

One of 10,000+ projects Taiyo tracks in Georgia.

Source: Georgia Department of Transportation (GDOT)

The existing 298 ft.twin bridges will be replaced with 315 ft. twin bridges with two 12 ft. lanes per bridge with 12 ft. outside shoulders and 12 ft. inside shoulders. The proposed bridges will be raised approximately 3 feet to meet the minimum vertical clearance under the bridge and to accommodate concrete beams. The roadway shoulders will be widened to 12 ft. During construction the traffic will

Status
Under Construction
Sector
Bridge, Cement, Road, Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 10 LOOP EB & WB @ SR 8/US 29

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 10 LOOP EB & WB @ SR 8/US 29” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The existing 298 ft.twin bridges will be replaced with 315 ft. twin bridges with two 12 ft. lanes per bridge with 12 ft. outside shoulders and 12 ft. inside shoulders. The proposed bridges will be raised approximately 3 feet to meet the minimum vertical clearance under the bridge and to accommodate concrete beams. The roadway shoulders will be widened to 12 ft. During construction the traffic will be shifted across the median to one bridge while the other is reconstructed and shifted to the previously completed bridge to complete the project. The SB US 29 Off-Ramp and the SR entrance 10 Loop from Old Hull Road will be closed to traffic and detoured approximately 0.20 miles along Athena Drive and then 0.32 miles along Old Hull Road.The proposed project is 0.67 miles in length.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Cement, Road, Government

Article published date

2024-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project