SR 104 @ CR 16/HALALI ROAD IN COLUMBIA COUNTY
Sector: Raw Materials • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
SR 104/ Washington Road will be widened 6 ft on the north side and 18 ft on the southside to provide one 12 ft westbound lane, two 12 ft eastbound lanes, one 12 ft separate left-turn lane (westbound and eastbound) and one 12 ft separate westbound right-turn lane. CR 16/ Halali Farm Road will be widened 12 ft on the westside to provide one 12 ft northbound lane, one 12 ft southbound left-turn lane
- Status
- Closed
- Sector
- Raw Materials, Road, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 104 @ CR 16/HALALI ROAD IN COLUMBIA COUNTY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SR 104/ Washington Road will be widened 6 ft on the north side and 18 ft on the southside to provide one 12 ft westbound lane, two 12 ft eastbound lanes, one 12 ft separate left-turn lane (westbound and eastbound) and one 12 ft separate westbound right-turn lane. CR 16/ Halali Farm Road will be widened 12 ft on the westside to provide one 12 ft northbound lane, one 12 ft southbound left-turn lane and one southbound optional turn lane. A Rural Shoulder Section is proposed for SR 104 and CR 16. The project includes the installation of a traffic signal at this location to reduce the number of crashes, improve safety and the orderly progression of traffic through the intersection. The project will improve 1450 ft of SR 104/ Washington Road and 430 ft of CR 16/ Halali Road. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Road, Government |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
