SR 106 FROM MP 0.61 S. OF CR 393 TO MP 2.48 N OF CR 177
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Georgia Department of Transportation (GDOT)
The project is the reconstruction of State Route 106 to improve profile grades from MP 0.607 to MP 2.330. The project proposes to lower crest vertical curves and raise sag vertical curves along State Route 106 to meet current design and sight distance requirements. A new intersection with Burroughs Smith Road, Sanford Road, and the elementary school will be constructed, which will include left an
- Status
- Closed
- Sector
- Road, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 106 FROM MP 0.61 S. OF CR 393 TO MP 2.48 N OF CR 177
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is the reconstruction of State Route 106 to improve profile grades from MP 0.607 to MP 2.330. The project proposes to lower crest vertical curves and raise sag vertical curves along State Route 106 to meet current design and sight distance requirements. A new intersection with Burroughs Smith Road, Sanford Road, and the elementary school will be constructed, which will include left and right turn lanes on SR 106 and a left turn lane on Burroughs Smith Road and the school drive. A traffic signal will also be installed at this intersection. Sanford Road will tie to SR 106 approximately 1100' north of this intersection and turning lanes will be provided. The intersection of SR 106 and Willis Glenn Road will be reconstructed and left turn lanes along SR 106 will be provided. The existing roadway consisting of two 12' lanes with variable width shoulders will be replaced with two 12' lanes with 10' shoulders. An off-site detour will maintain traffic during the construction. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source reliability | High |
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2024-01-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
